Advertisement
trendingPhotosenglish2423351https://zeenews.india.com/photos/business/in-pics-prime-minister-narendra-modi-inaugurates-9km-stretch-on-kanpur-metro-rail-project-2423351
photoDetails

In Pics: Prime Minister Narendra Modi inaugurates 9km stretch on Kanpur Metro Rail Project

PM Modi has inaugurated 9 Km long section from IIT Kanpur to Moti Jheel which is part of the 32 km long Kanpur Metro Project being built at a cost of over Rs 11,000 crore.

Kanpur Metro Rail Project

1/8
Kanpur Metro Rail Project

Prime Minister Narendra Modi along with Uttar Pradesh Chief Minister Yogi Adityanath took a ride on the newly inaugurated Kanpur Metro.

Kanpur Metro Rail Project

2/8
Kanpur Metro Rail Project

Kanpur Metro is an urban Mass Rapid Transit System (MRTS) and The project’s foundation stone was laid by Prime Minister Narendra Modi on March 8, 2019.

 

Kanpur Metro Rail Project

3/8
Kanpur Metro Rail Project

Kanpur Metro will be built in phases, with Phase 1 having 2 lines and 30 stations developed across 32.385 km of routes.

 

Kanpur Metro Rail Project

4/8
Kanpur Metro Rail Project

The top speed of the Metro is 80 kmph and the 8.7 km Priority Corridor from IIT Kanpur to Moti Jheel was inaugurated by Prime Minister Narendra Modi.

Kanpur Metro Rail Project

5/8
Kanpur Metro Rail Project

Line 1 Station Names: IIT Kanpur, Kalyanpur Railway Station, SPM Hospital, CSJM University, Gurudev Chauraha, Geeta Nagar, Rawatpur Railway Station, Lala Lajpat Rai Hospital, Moti Jheel, Chunniganj, Naveen Market, Bada Chauraha, Nayaganj, Birhana Road, Kanpur Central Railway Station, ISBT Jhakarkatti, Old Transport Nagar, Kidwai Nagar North, Kidwai Nagar South, Yashoda Nagar, Baudh Nagar and Naubasta.

Kanpur Metro Rail Project

6/8
Kanpur Metro Rail Project

Line 2 Station Names: CSA University, GSVM Medical College, Rawatpur Railway Station, Kakadeo, Vijay Nagar, Dada Nagar, Barra-7, Barra-8 and Jarauli.

Kanpur Metro Rail Project

7/8
Kanpur Metro Rail Project

Kanpur Metro’s highest point is at 15.164 km (Elevated) and the lowest point is at 8.621 km (Underground).

Kanpur Metro Rail Project

8/8
Kanpur Metro Rail Project

With the first stretch of priority corridor operational, the Phase 1 is expected to be completed by December 2024.

NEWS ON ONE CLICK